previous page
nederlands search route & contact
next page

new pier schiphol

cepezed and cepezedinterior are part of the international and integral design team coordinated by AECOM that designs the new Schiphol pier. Jointly, Team AECOM will provide the full design of the new pier and its corresponding airside facilities. Both architecture and interior set the passenger experience at the center of the design. The new pier has several floors and offers multiple different seating, relax and working areas. Characteristic will be the large windows and green vides between the different traveler levels that bring light and air into the building. The new pier provides Schiphol with eight new gates: five for narrow-body aircrafts on the north side and three for wide-body planes on the south side, which can also be used for six narrow-bodies. Later, two extra gates for wide-bodies will be realized on the south side. The design for the new pier will be finished by the end of 2017. Construction starts in 2018 and completion is planned for 2019.

schiphol / the netherlands

client
schiphol nederland bv

previous page
next page